WHY THIS IS RELEVANT
TO CONSTRUCTION PROFESSIONALS

THE TIP OF THE TIP

- thousands of Structural Waterproofing Solutions
FAIL every Year

HOW IT ALWAYS ENDS !

- when Structural Waterproofing fails.

A LOT OF WATERPROOFING

- is Doomed to fail

A TRAINED EYE

- can see this Coming Already in the Specification

USELESS OVERKILL

- worth € 120.000

€ 20.000 TO REPAIR

- € 120 to Prevent !

JOB-SITE MANAGEMENT

- should always be Specified

MINOR MISTAKES

- can have huge consequences

IGNORE RULE # 1

- and pay a lot more than you saved

MOST PEOPLE

- don't think it will happen to Them

ONLY FEW REASONS

- but tons of Repetitions

THIS WATERPROOFING PRODUCT

- "survived" less that 5 years

WEAK CCP DESIGN

- created expensive "Waterproofing Bypass"

WATERPROOFING
"MISSION IMPOSSIBLES"

- MUST be eliminated in the DESIGN

HIGH RISK
+ LOW ATTENTION

- the definition of Waterproofing Disasters

MANY WATERPROOFING PRODUCTS

- will not work as expected

SOME WATERPROOFING PRODUCTS

- don't work AT ALL

REQUIRE A STRONG
NON-PRODUCT BIASED FOCUS

To Learn More: Book a FREE Discovery Call

CLEAN THE SOLUTION
BEFORE YOU START

To Learn More: Book a FREE Discovery Call

DO WHAT YOU USUALLY DO
AND GET WHAT YOU USUALLY GET

WE HELP YOU MINIMIZE 3 THINGS
WHEN WATERPROOFING STRUCTURES:

Image

UNDERKILL

UNDERKILL is the Mother of every Waterproofing Failure.
It simply means that the Solution isn't STRONG enough.

A Waterproofing Solution consists of 3 Main Elements that all have to align.

If One of these Elements is WEAKER, the entire Waterproofing risk Failing, leading to huge Repair Costs, Reduced Use Value, and Shortened Life span.

OVERKILL

OVERKILL is simply a Waste of Resources.

Because of the way the Industry handle Most Waterproofing Processes, a large portion of useless Product Consumption are being built in already in the Design phase.

When we help Contractors Assess their Waterproofing PRIOR to execution, we find a lot of Saving Potentials (and potential Risks).

Example: In the last 10 Projects in which we have been involved (as per the date of writing this content), the Cut Backs reached an Average of €30.000.
Furthermore we have Learned that there is a correlation between Assessment TIMING, and Saving POTENTIALS.

STRESS

STRESS comes in two versions, when Structural Waterproofing Fails.

PROCESS STRESS: Since the Execution of most Waterproofing happens at an early stage of the Construction Process, problems and delays can have a negative impact on subsequent processes, leading to accelerated stress.

PERSONAL STRESS: The Construction Process Margins are tight, and the Construction Professionals are under severe pressure.
Having to deal with something as uncontrollable as a leaking structure puts unnecessary stress on especially the Project Managers.

 

- AND WE DO IT BY HELPING:

Image

THE OWNER

- to define a simple yet effective set of expectations regarding the Waterproofing Standards

Image

THE SPECIFIER

- to make Strong Specifications defending the Interests of the Structure only

Image

THE CONTRACTOR

- Detect Risks and Cut Back Options before Executing, and to Optimize the Practical Routines + to be a Resource during the Process

- and by being the Independent,Qualified and Experienced Resource throughout the Entire Project:

OUR MAIN SERVICES:

Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image

WE HAVE A LOT OF DIFFERENT SERVICES
BUT ONLY 1 FOCUS:

THE INTERESTS OF THE STRUCTURE !

 

In a Waterproofing Project many Parties are involved.

These Parties all have at least ONE interest
that goes before those of the Structure.

For that Reason,
we see it as Our most important Job:
To be the SPOKESMAN OF THE STRUCTURE

- simply because THAT benefits (almost) everybody the most

Image

WE INSIST ON USING THIS TOOL:

WaterProofing Quality Chain ©

 

The only 100% dedicated
Waterproofing Process Management Tool
in the World

 

- designed to fit all types of Waterproofing Projects

Image

Each Waterproofing Requirement/Structure should be treated Uniquely

All Waterproofing Processes can be handled the Same

WE WORK GLOBALLY

WATERPROOFING PRINCIPLES ARE UNIVERSAL

 global improvement

We assist waterproofing projects globally,
which is why this platform is in english (light)

You can talk to us in:

wpp flag 

The "Language of Waterproofing" is the same all over the planet

Image

Image

if you find this platform potentially helpful to somebody else...